CleanSpark sold 2,102 BTC in the quarter ended September 30, 2026, while its miners produced 1,708 BTC. The company is considering selling more than it mines in future quarters, a step beyond its existing plan to sell nearly all newly mined Bitcoin to cover operating costs.
CFO Gary Vecchiarelli said drawing on reserves would reduce the company’s exposure to Bitcoin price swings and help it raise cash without issuing shares or taking on new debt. He said CleanSpark would respond to market conditions rather than commit to a fixed sales pace.
CleanSpark ended September with 13,530 BTC, its first quarterly decline in Bitcoin holdings since at least 2024. It has since sold an undisclosed amount to fund expected acquisitions. The company’s Bitcoin holdings were valued at $1.1 billion at the end of September, compared with about $806 million as of November 25.
Bitcoin valuation changes accounted for much of the earnings swing
CleanSpark reported a $987 million net loss for the fiscal year ended September 30, compared with net income of about $364 million a year earlier. Noncash changes in the value of its Bitcoin accounted for roughly two-thirds of that year-to-year swing. Bitcoin fell from about $114,100 to $83,600 over the fiscal year.
Annual revenue fell 25% to $576.5 million, and adjusted EBITDA was a loss of $304.2 million. CleanSpark mined 7,253 BTC during the year, down 8%. The fourth quarter was profitable: net income reached nearly $9.8 million despite a 46% decline in revenue to $120.9 million.
CleanSpark shares fell 7.5% to $5.12 on November 24, before the earnings release, and slipped another 2.25% in after-hours trading. The stock was down 55% for the year to date.
A smaller mining fleet and a planned shift to AI in Georgia
CleanSpark removed about 25,000 mining machines during the quarter, leaving roughly 200,000 running. The remaining fleet used 14.8 joules per terahash, down from 15.8. Vecchiarelli said the improved energy efficiency should help keep mining profitable if conditions worsen before the 2028 Bitcoin halving. The company plans to keep mining as long as it remains profitable.
In Sandersville, Georgia, CleanSpark’s first AI data hall remains on track for the fourth quarter of 2027. A 20-year, $6.6 billion lease fully funds the project. CleanSpark plans to begin disconnecting miners at the site in late 2027, then decide whether to move or sell them. It also wants to develop 885 megawatts of power capacity in Texas for AI leases.